Gemma 4 E2B W4A16¶
Current status and review date¶
Decision snapshot
- Product role: Historical RTX 5090 Fast-lane challenger.
- Selected or best-qualified configuration:
google/gemma-4-E2B-it-qat-w4a16-ctwith the July 15 tokenizer, vLLM 0.25.1, FP8 KV, 131,072 configured tokens, and thinking disabled. - Measured hardware: One NVIDIA RTX 5090, 32 GB, one LLM serve at a time.
- Evidence: 30K, 60K, and 120K preflight passes; 0.43-second TTFT and 96 aggregate tok/s at 32K/c1; 0.21 seconds and 204 aggregate tok/s at c2.
- Decision:
no-promotion; the Fast control remained selected. - Important limitation: Repeated timeout triage failed 0/3. The capacity rows are mixed short-generation aggregates, not controlled decode rates.
- Review dates: Evidence through 2026-07-16; dossier reviewed 2026-09-17.
Review narrative¶
2026-07-16 — July 15 template candidate¶
The official E2B checkpoint and updated tokenizer fit the 32 GB Fast lane and passed the retained context preflights. Its faster short-workload capacity did not clear the repeated strict timeout-triage gate, so the existing E4B control remained selected. This retained result is not a current route claim.
Immutable identity¶
Official E2B lane¶
- Model:
google/gemma-4-E2B-it-qat-w4a16-ctat93c069399e6574553f7b59cec1d1ddf1c332a916. - Tokenizer:
google/gemma-4-E2B-itat179516f0c449474fdc46f08f30ead5b11e178497. - Runtime: vLLM 0.25.1 image
sha256:e4f88a835143cd22aee2397a26ec6bb80b3a4a6fe0c882bcbc63822904766089.
Tested hardware and topology¶
- Measured: One RTX 5090, 32 GB, in the Fast lane.
- Execution mode: One LLM serve on the card during measurement.
- Comparability boundary: The same dated finding includes a separate dual-card lane; its result is not part of this single-card decision.
Engine, quantization, KV, context, and concurrency recipe¶
Official July 15 template lane¶
- Engine and image: vLLM 0.25.1, digest pinned above.
- Weights and KV: W4A16 and FP8 KV.
- Topology: One RTX 5090; c1 and c2 short-workload cells.
- Contract: 131,072 configured tokens and thinking disabled.
- Recipe: dated Fast matrix and retained quality artifact.
Evidence by measurement class¶
Functional, context, and capacity¶
- Status:
functionaland boundedcapacity. - Measured: Preflight passed at 30K, 60K, and 120K. The 32K/c1 cell recorded 0.43-second TTFT and 96 aggregate tok/s; c2 recorded 0.21 seconds and 204 aggregate tok/s.
- Limits: These are fixed-context, short-generation aggregates and do not establish controlled decode or full-window concurrency.
- Evidence: dated finding and 120K capacity artifact.
Strict quality gate¶
- Status: bounded
qualityfailure. - Measured: Timeout triage passed 0/3 under the repeated strict gate.
- Limits: This is a narrow deterministic gate, not a general intelligence score.
- Evidence: quality artifact.
Decision and promotion state¶
Rejected, superseded, or incomplete¶
- E2B W4A16:
no-promotion; the existing E4B FP8-Dynamic Fast control was retained because E2B did not pass the strict quality gate.
Failures and gotchas¶
Evidence and interpretation limits¶
- Timeout triage: The 0/3 result blocks Fast-lane selection despite the retained preflight and capacity observations.
- Rate meaning: Aggregate output rates from the short workload are not decode-only performance claims.
Dated run history¶
- 2026-07-16 — Gemma 4 July 15 chat-template bakeoff.